Air cooling module system of air conditioning engineering
--Ready to delivery
Because of the advantage follows, the client in Shanghai choose this air cooling module with no hesitate, 1. When heating needed in winter, the system can replace the hot water boiler. 2. When cooling needed in summer ,there is no cooling tower required which will avoid the noise and fungal contamination from cooling tower and make the environment more clean and beautiful. 3. Refrigeration energy efficiency ratio can reach above 5.0. 4. In winter,about 4kw of heat can be obtained but only 1kW electric energy needed, and the performance parameters is above 4.3 5. The energy utilization rate is 3-4 times than the electricity heating mode. The operating cost only 1/2-1/3 of traditional way. 6. c/w American Copeland compressor and refrigeration parts, which ensure to efficiently and reliably operate the unit. 8. Efficient shell tube heat exchanger developed together with domestic professional manufacturers, special designed for the JINDUN water central air conditioning unit . 9. The high quality of water source heat pump controller combined with special control program, so that the hosts in intelligence is superior to similar products 10. Fully controlled by computer . And have a spare manual operating system.
EQUIPMENT IN THE GREENHOUSE
EQUIPMNET OUT OF THE GREENHOUSE
CONTACT US
Address:Chuangye Rd.Dongxia Estate, Qingzhou City, Shandong Province, P.R.China